hello,
as title says, does anyone knows how to fix a limit to the time that an abaqus job takes to be calculated.
this is because i am running several jobs sequentially, and i want to set that for instance if some job takes too much time, just stop it and go to the next one.
thank you a lot.
Forums
Free Tags
anyone?
anyone?
None to my knowledge. The
None to my knowledge.
The easiest way to do it would be to execute the analysis through batch file (windows) or shell script (Linux/unix).
------
The world started with 0, is progressing with 0, but doesn't want 0.