Skip to main content

Pile-Soil Interaction in Abaqus

Submitted by abhinavka on

Hi

I am trying to simulate a laterally loaded pile in Abaqus. However, once the initial stress is generated using the geostatic step, i have no idea on how to replace the soil with the pile.

I request help with the situation.